You’ve got two or three pool quotes on the kitchen table. The numbers are different, the formats are different, and each salesperson told you theirs is the best deal. How do you actually compare them?
The trick is to stop comparing prices and start comparing scope. Here’s the checklist we’d use if we were in your shoes.
1. Is it the same pool?
- Manufacturer, model and exact size (length × width × depth).
- Shell color and any built-in features (steps, benches, spa).
- For fiberglass: whose shell is it, and what does its warranty say?
2. What’s included in the construction?
Look for each of these as a clear line — or a clear “excluded”:
- Delivery, crane and site access
- Excavation and hauling away the dirt
- Base material and backfill
- Plumbing and pressure testing
- Electrical and bonding
- Water for the initial fill
- Cleanup and final grading
Missing items aren’t free — they become surprise costs later.
3. What equipment, exactly?
“Pump and filter” isn’t enough. Ask for brands and models: pump, filter, sanitation system, heater, lights, automation. At Sun Harbor, equipment models are recorded in your proposal.
4. Deck, coping and additions
- Paver brand, collection and color, and the measured square footage.
- Coping type.
- Additions like a screen enclosure, water features or lighting — each with its own scope.
- Any allowances (and what happens if you go over them).
5. Permits and inspections
Who files the permits? Who pays the fees? Who schedules inspections? A good answer is: “We do — every one.” See our permits guide.
6. A real timeline
“6–12 weeks” is not a timeline. Ask for a schedule that starts at kickoff and includes design, permits, installation, finishes and handover — and what happens if it changes. Ours is a complete 50-day plan.
7. Payment terms
- Total price, taxes and fees.
- Payment milestones tied to real progress — not large payments far ahead of the work.
- Offer validity date.
- Financing: if you finance, compare APR, fees, term, monthly payment and total financed cost.
8. Changes and warranties
- Change orders: any change should be written, with work, price and schedule impact, before it happens.
- Warranties: shell, equipment and workmanship are separate. Ask for the actual terms in writing.
9. After the pool is done
Is there an owner walkthrough? A completion record of any remaining items? A clear way to ask for help later?
The question that cuts through everything
“Can you show me, in writing, everything that’s included — and everything that isn’t?”
A confident builder will say yes. That’s how we work: every question answered before you sign, with the scope, investment and plan in your proposal.
Want a proposal you can compare line by line? Start with a free design consultation, or text us your quote questions — we’re happy to explain what you’re looking at.